Simulation of production process manufacturing parts
DOI:
https://doi.org/10.25206/1813-8225-2018-162-230-234Keywords:
simulation modeling, production system, simulation model, parts manufacturing, production organizationAbstract
The organization of the production process of manufacturing parts may be multivariate. Using optimization parameters — the
maximum possible amount of manufacturing of suitable parts and maximum equipment load (i.e. maximizing profit), as well
as limitations — reject rate, the possibility of reprocessing parts in the simulation system of Arena Rockwell Soft various models
are developed that revealed bottlenecks in the organization of the production process. Consideration of the models allowed
us to estimate: the workload of the machines, the production of suitable parts, the average length of time the parts are in the
production process, the average number of parts in the queue, and the profits and losses during the production process. As a
result of the simulation, it is shown that the most optimal form of organization of the production process, which increases the profit by 1,45 times, is a two-subject production line.
Downloads
Published
How to Cite
Issue
Section
License
Non-exclusive rights to the article are transferred to the journal in full accordance with the Creative Commons License BY-NC-SA 4.0 «Attribution-NonCommercial-ShareAlike 4.0 Worldwide License (CC BY-NC-SA 4.0»)